This information was brought to you by H.B. Maynard and Company, Inc. We provide tools, training and guidance to our clients to help them improve workforce performance and eliminate waste.
http://www.hbmaynard.com
Information about this page can be found at the bottom of this page...

MOST® CERTIFICATION PROGRAM
TRAINING COURSE

COURSE SUMMARY: This five-day interactive training course will provide you with a broad perspective of work measurement and teach you how to apply the BasicMOST work measurement system.

COURSE OBJECTIVES: (by the end of this course you will be able to)

  • Calculate the time that a task or set of tasks should take to be performed.
  • Apply predetermined time values to activities from memory or from a data card according to the rules of BasicMOST work measurement system.
  • Observe operator activities and write accurate method descriptions using the work measurement system.
  • Analyze work on the basis of moving objects using the BasicMOST work measurement system.
  • Identify work measurement activities in terms of the basic sequence models for manual work: General Move, Controlled Move, Tool Use and Equipment Use.

WHO SHOULD ATTEND: Anyone interested in learning an efficient and widely accepted work measurement system.

KEY COURSE CONTENT:

    Understand the foundation of work measurement

  • Learn why work measurement is important to an organization.
  • Learn about the traditional work measurement techniques of time study and predetermined motion time systems.
    Learn the three basic sequence models used in BasicMOST work measurement system
  • General Move – work measurement sequence model for the movement of an object freely through the air.
  • Controlled Move – work measurement sequence model for the movement of an object while it remains in contact with a surface or is attached to another object during movement.
  • Tool Use – work measurement sequence model for the use of common hand tools.
  • Equipment Use - sequence model for various administrative activities.
  • Apply the work measurement sequence models in practice exercises and video examples.
    Use the StandardsPro® work measurement software
  • Learn how to use the work measurement software to measure work more quickly.

BENEFITS TO YOUR ORGANIZATION WHEN YOU TAKE THIS COURSE:

  • Enables you to analyze any type of manual work with one of the most efficient and widely used work measurement techniques.
  • Reduces the time needed to analyze work as MOST® can be applied in a fraction of the time it takes to perform traditional work measurement time study or other predetermined motion time systems.
  • Provides you with a work measurement tool that is ‘method sensitive’ where the outcome of the analysis provides cues as to where there are opportunities for saving time, money and energy.
  • Eliminates the subjectivity involved in performance rating an activity since the MOST work measurement technique is based on a 100% pace.
  • Meets the work measurement needs of many industries such as manufacturing, service and distribution and is a work measurement tool that is well accepted by employees, unions and management.

View Schedule of Course

COURSE DETAILS:

Length:
Format:
Location:
Registration Fee:
Five days
Interactive
Pittsburgh Training Center or On-Site
$2,500

REGISTRATION:

To register or learn more about this course:

   412.937.6059
   Pittsburgh.PWC.Online.Training@accenture.com
   Call 1.800.629.6273, Option 3 for On-Site Training Costs.

MISCELLANEOUS INFORMATION:


Last Modified:Wednesday, March 26, 2008 at 5:05:00 PM EST ©2003, H. B. Maynard and Company, Inc. All Rights Reserved.  
H. B. Maynard and Company Inc., Seven Parkway Center, Pittsburgh PA 15220
Phone: 1.800.629.6273, 412.937.6380, Fax: 412.937.6381